LaGuardia Airport Terminal B to Flushing-Main St by subway
42 min, 1 change, via the Q70 LaGuardia Link & 7 train.
How to get there
- At Laguardia/Terminal B, take the Q70 LaGuardia Link towards Roosevelt Av/61 St. Ride 3 stops (about 20 min), past Laguardia/Terminal C and Laguardia Rd/94 St, and get off at 74 St/Roosevelt Av Station. For the quickest change, ride any car.
- Change to the 7 train: about 3 min on foot inside 74 St/Roosevelt Av Station, without going through the turnstiles again.
- At 74 St-Broadway, take the 7 train towards Flushing-Main St. Ride 7 stops (about 18 min), past 82 St-Jackson Hts, 90 St-Elmhurst Av, Junction Blvd, 103 St-Corona Plaza, 111 St and Mets-Willets Point, and get off at Flushing-Main St.
First and last trains
From the MTA timetable for the boarding stop of each train on this journey.
- The 7 train at 74 St-Broadway towards Flushing-Main St runs 24 hours a day, seven days a week.
Late nights
Between midnight and 5 am this journey stays on the same trains: every stop of it is on the late-night subway map. Trains run less often, so allow extra time.
Fare
One subway ride costs $3.00 — tap a contactless bank card, phone or OMNY card at the turnstile. The fare is the same for any distance and at any time of day. A change inside the station costs nothing: you stay behind the turnstiles. Riding often? After 12 paid rides in 7 days ($35.00) the rest of the week is free on the same card or phone — the cap counts from your first tap. Reduced fare: $1.50. This journey includes MTA Bus, which charges its own fare.
Subway fares and how to pay · How the 7-day cap works
Step-free access
Every station on this journey is fully accessible. Elevators can be out of service; the map shows live status.
- Laguardia/Terminal B is fully accessible: elevators reach the platforms from the street.
- 74 St-Broadway is fully accessible: elevators reach the platforms from the street. Elevators: Roosevelt Av & 74 St (SE corner) to Flushing Mn St-bound 7 plat & E/F/M/R/7 mezzanines; transfer mezzanine to Manhattan-bound E/F/M/R platform and mezzanine for access to Queens-bound E/F/M/R service; mezzanine to Forest Hills and Jamaica-bound E/F/M/R platform; mezzanine to Manhattan-bound 7 platform.
- Flushing-Main St is fully accessible: elevators reach the platforms from the street. Elevators: East of Main St & Roosevelt Ave to Manhattan-bound platform.
Exits at Flushing-Main St
- Main St & Roosevelt Ave — SW corner (stairs), SE corner (stairs), NW corner (stairs), NE corner (stairs), NE corner (elevator), NE corner (escalator)
The stations
- Laguardia/Terminal B is at Laguardia & Terminal B. Laguardia/Terminal B station details
- Flushing-Main St is at Main St & Roosevelt Ave, Queens. It has 4 OMNY vending machines, 12 help points and 34 countdown clocks. Flushing-Main St station details
Before you go
Weekend and night work often reroutes New York trains. Live status of the 7 train.
More journeys
- Flushing-Main St to LaGuardia Airport Terminal B
- LaGuardia Airport Terminal B to Times Sq-42 St
- LaGuardia Airport Terminal B to Grand Central-42 St
- LaGuardia Airport Terminal B to 34 St-Herald Sq
- LaGuardia Airport Terminal B to 14 St-Union Sq
- LaGuardia Airport Terminal B to 34 St-Penn Station (A C E)
- LaGuardia Airport Terminal B to Fulton St
- Times Sq-42 St to Flushing-Main St
- Grand Central-42 St to Flushing-Main St
- 34 St-Herald Sq to Flushing-Main St
- 14 St-Union Sq to Flushing-Main St
- 34 St-Penn Station (A C E) to Flushing-Main St
- Fulton St to Flushing-Main St
Some station facts: Wikipedia (CC BY-SA 4.0).
Questions
- How long does it take to get from LaGuardia Airport Terminal B to Flushing-Main St?
- About 42 min by subway, with 1 change via the Q70 LaGuardia Link & 7 train.
- How many changes from LaGuardia Airport Terminal B to Flushing-Main St?
- 1 change, via the Q70 LaGuardia Link & 7 train.
- Which train goes from LaGuardia Airport Terminal B to Flushing-Main St?
- The Q70 LaGuardia Link & 7 train.
- Is the journey from LaGuardia Airport Terminal B to Flushing-Main St step-free?
- Yes — every station on it is fully accessible with elevators to the platforms.
Journey times from the MTA timetable for a weekday departure at noon, generated on 2026-11-03. Live service status is shown on the map.